So I decided to post another repairs. Maybe someone will come in handy.
First we pop up, and then we open the floor and all garbage (lags, clamzit, metal hooks delete delet) !!!
We put on the "American" battery, close the seams by mounting foam, draw the path under the ships.
Strokes, insert meators, deposit the cable and make a review of work.
We smear the floor with waterproofing (we live on the first floor) and cut the demospheas tape.
Lentifying the penplex, and insulate the wall under the window.
Polyurex fasten with scotch, we put the element of the floor (first on glue + on the self-tapping screw)
Floor elements Wash the PVA glue and, after cooking, shit
After plastering and stripping, we appline PVA glue on the walls (for better hitch)
We give the cork substrate (although the laminate is already with the substrate, but we had to go to the floor of the floor of the kitchen, because he is slightly raised due to the glue, which stacked the porcelain stoneware), and put the laminate on metal castles.
It seems like that.