Bedroom repair

Anonim

Bedroom repair
Rarely, who succeeds at least once to avoid repairs in his apartment on its own forces. It does not suit the cost of repair, someone. And so we, armed with our own construction skills, we take for this painstaking work, to the end are not confident as a result. It is rare quickly and professionally and therefore it stretches this "Pleasure" for a long time, and the quality - sometimes pleases us, and sometimes, not very, but the saved money is warm all. We humble with small disadvantages and swear to ourselves that next time we will do "everything, as it should."

Before the new year, a wife once again, looming a sadness to a lagged bedroom with a pan. And opaquely hinted that "it's time to repair." For the last 7 years, the wallpaper swept, the places began to fall off, and the cat at one time would well have worked. I, something "bobby" in response, realized that this time I did not cope, especially since there were a long, New Year holidays.

Thus, for the New Year in the list of gifts, a separate article of the "Bedroom Repair" appeared. In the morning of the 2nd day of the New Year, with a feeling of the holiday stolen, I began to repair.

Last time, looked around the room with a look,

Bedroom repair
Bedroom repair

I am pleased to shoot old wallpapers, folding them on the floor. After the whole Paul was Upanov, I began to stick the ceiling plinth over the entire contour of the room and prepare the ceiling to paint. The walls in the room are lined with GVL and therefore the ceiling plinth was additionally fixed with small cloves to the wall, providing clamp in uneven places.

The gaps sushpakleval, speckled and covered the ceiling and plinth two layers of white water-emulsion paint.

While the ceiling came down at the level of horizontal marking under the wall molding at an altitude of 90cm. from gender.

Bedroom repair

The markup consolidated on glue and cloves molding throughout the perimeter of the room.

Bedroom repair

Bedroom repair

Bedroom repair

Door - "Blinds", the built-in closet replaced on the usual - interroom

Bedroom repair

and separated the contour box with molding. The visible nails caps are put on, and Moldings are painted with white paint.

In the top of the wall, the horizontal and vertical moldings of the finishing of the color insertion are fixed.

Bedroom repair

In the corners are applied and the corner elements of the decor are applied.

Bedroom repair

Bedroom repair

which are pre-painted paint

Bedroom repair

Next is the outer part of the wall,

Bedroom repair

And then the inside.

Bedroom repair

After drying the wallpaper, an angular decor element is pasted,

Bedroom repair

The joints of the joints are additionally painted.

The bottom of the wall is covered with wallpaper. The room is transformed and acquires an almost finished look.

Bedroom repair

Bedroom repair

Then laminate laminate on the floor

Bedroom repair

Bedroom repair

Bedroom repair

Bedroom repair

Bedroom repair

And the plinth is installed in which the wiring is stacked.

Bedroom repair

Bedroom repair

The heating tube is removed into the galvanized profile of PP-60, and is trimmed with a plinth.

Bedroom repair

Bedroom repair

And now the room has already acquired the final appearance.

Bedroom repair

Bedroom repair

Bedroom repair

Bedroom repair

It remains to add a new interior with some details: eaves, curtains, paintings, lamps, etc., but this is a matter of wife and its contribution to the repair.

I had to do everything alone and naturally, in a period of time until January 9 did not meet. Labor weekdays began, and the laminate was settled only in early February, so it turned out not a bad gift to himself by February 23 and his wife for the 8th of March, although I would still feel my wife. This new 2013, I will remember for a long time!

Required consumables for room 15 sq. M:

-Fromulsion paint (7l),

-cakes for foam (2 bottles of 250ml),

-Gype finish putty for climbing irregularities (5kg.),

-Montamic foam (1Balon),

Read more