I'll tell you how we changed the carpet and repaired the wooden floor. If anyone also has wooden floors, I will show what we did, maybe you will come in handy. The best of three parts, big and detailed.
Immediately write in the header results-our error.
We made a mistake with a substrate of polyethylene foam under carpet. Its in no case cannot be treated in the backstage, only in the butt sheets, tense well, so that there are no buggers and nurture the stapler to the floor. Otherwise, there will be all carpet in the hills and waves at the exit. There are also the edges of the edges in the invisible places, they screwed the edges to the floor without self-drawing .. We all reworked, and this is repeated horror. But thank God made. Do not repeat our mistakes. We just did not know and on our experience they were checked and redid. The boards are great now behave when we strengthened them with self-drawing, the floor now does not creak and the boards do not stick.
Part 1. Fight and promotion of carpet into the desired width.
We bought it in the online store and we literally brought it after 4 hours.
Brought to the house, so it is in the hallway.
Then they dragged into the room.
Now it's time to look at him alive and deploy.
Unfortunately, he was swollen not as we needed ...
corrupt.
Further and farther. And all 7 meters were twice in addition. And we need the carpet in the roll to be 3 meters in its width. Now it has to turn it as it is necessary.
At first it was 7 meters ...
And then they have already begun how to deploy it and turn the width to us for work. I got on its beauty.
We were warned that the carpet is similar to the one we ordered, but a little drawing another, when I ordered, there was much more, and the colors are much smaller. But I liked my wife and we left him.
In general, unfolded it completely.
And then in a roll of three meters folded, it was also an epic. I was holding the edge, and Zhenya from the other edge twisted him. Read and folding the carpet was on April 6.
Part 2. Building carpet along zones and floor repair
Of course, everything was planned in advance and started on April 7, His laying on the floor.
We started to do everything in step by step, because there is nowhere to endure the furniture. First, from the bed area. There are a cabinet book and aquarium by 250 liters.
We started with the parsing of a wooden bed two-bedroom. Without apricot, but how.
Zhenya completely disassembled her.
Our Lapul tried us to leave us in this hard matter.
Everything is interesting for her.
After you have taken a disassembled bed, took up the aquarium. The aquarium has not fully disenmissively. To merge almost to the end, but in order not to catch the fish and not pull the plants. But to raise it so that it really was.
The aquarium took a little further, where the floor is not yet to change and put on the banquette, the plants needed to cover with top with something wet, so that they did not dry and did not die, covered with a towel. It took about 80 kg.
After the aquarium began to freely fully all this part of the room.
After the aquarium was moved, the old palace of parts cut off and throw away. All the wires fixed on the wall.
After removing the old coating,
I my this section of the floor in linoleum and splashing orange essential oil, for a good haze. Linoleum decided not to shoot, it was normally preserved and natural to the same. The plaques of the floor board were obsessed with time and creaked very, but integers and good. So the floor repair was solved with the original way. Bought 1 kg of good screws of 90 mm, and self-tapping screws were screwed into the lags of the floor to each board, and in each lag and every board for a self-tapping screw. Self-timers went all 1 kg to the entire floor. So the boards stopped swing and creaked. Fully came to the full norm.
First, it is stuck to the substrate sheets from Polyeneetylene, they bought it under the carpet. It gives heat and isolation.
2x mm took. And you nail it with a stapler.
Then removed one column aside. Lower bookcase, which we will also be moved to another part of the room. He was also released as much as possible from books. Of course, such an echeclical event is akin to repair, an explosion is a real house.
And so we carried a large bottom closet, the top is well fixed on the wall. Now the roll with the new carpet is beginning to sharpen in this part of the room. Companion is 3 meters, so we reworked the residue of the roll at the very beginning when they bought it.
Put.
Then the next sheet of polyethylene foam under the carpet, the joints are fixed by the stapler. This is not correct, it should not be done in the back, but in the joint. Inciting the substrate and secure the stapler to the floor, so the carpet will not booke at the exit and falls smoothly.
Here you can see the place where the aquarium stood, all the wires on the wall, rolling on the carpet.
And already beauty declared itself. We took the carpet 3 meters wide and 7 meters long, although room 3 to 6, 1 meter for passing zone.
Carpet was from the wall to the wall.
The rest of the rest was waiting for the next disassembly of the house zones.
After the carpet in this part of the room, we start to put everything back to the place. At first the book bottom cabinet was installed and filled back with books. That is under the tapestry.
Then filled the top cabinet with books, I in my time she sewed the curtains in the form of an arched window.
Back put the aquarium and fill it immediately with water.
Here it is in fresh bubbles. It was carried carefully, put without distortion so he did not fame glory to God.
After the wardrobe and the aquarium put on the place, the bed until we put in place, there will be things on the other side of the room, armchairs and equipment.
Apricot was not failed to continue laying a new carpet.
Fox walked near the roll.
Everyone looked at the old floor and the TV that she was broadcast there.
He jumped to check out the old with the new one.
But the new always attracts more.
And went to walk along the new floor.
And also begin the second part of the room, first cutting up the old Palace with parts, I'll be my all and then the penne foam foam,
Nail.
And the roll is spinning further.
All wires and here on the wall are fixed.
TV broadcast news.
While the laying goes to my armchair with a computer.
Of course, under the substrate, we screw the screwdriver with a screwdriver everywhere in Polat's lagows.
And then carpet.
Then we removed my chair into the bed zone and the same layers were placed - foam, then the carpet was put to the end of the room. My computer table was not even cleaned, only the leg was lifted and rounded the carpet drove.
So laid 6 meters of carpet in the room. Cut off the meter for a plot that with the hallway is reported, but enters the room.
That's how it looks on the floor, the flash is wipit. So it is dark red.
Then they have already begun to put everything in place. When the armchairs began, the tables and the equipment to the place are back, we collect a bed back.
And that's all on the ground, the apricot is pleased with the new floor already.
Part 3. Laying the carpet in the passing area of the room.
A week later, in the groom's day off, on April 14, this work began.
Here we have always had separate mats, there have never been wholeness with a room. What is the joint of the new carpet of the room and the old rug in the passing zone.
All, clean the old rug, he served his.
I again washed the floor, Zhenya was screwed up the floor kg of screws in all lags of the floor, styling the substrate from Polyeneetylene and knocked her stapler to the floor.
We note how we will cut the carpet.
Like fabric before cutting.
Apricot and here with us.
And then you already cut off the size of the carpet.
I am cut in easily with my tailoring scissors.
And together with the apricot, we put a new carpet.
This is how it has become.
And that's how it was.
All doors were filmed with loops. I carefully soap them.
Then put the threshings.
Under the threshold goes the edge of the carpet.
Paws with us.
This neckline is communicated with the hallway.
This floor of the hallway can be seen.
Also, the thresholds fastened both in the kitchen, it is the doors of the kitchen.
That's how they worked. In the room for the day they laid and everyone left. Work from 9 am to 3 nights.
We were very pleased with the new floor.
Let it be not easy, but we did it.
In the passage zone, the carpet in the joints, small matte black self-testers, they are not visible and the edge is securely fixed.
And the main apricot is good.
I hope someone will use our experience in changing the carpet of the house. I would like to show everything and tell it in detail. I know that many do not solve this, but as you can see it is possible.
Alla shared.
A source