Good time of day. Let me bring to your attention your facility, namely the kitchen.
32 photos and letters, very slightly.
So, for the beginning we have:
1. Kitchen 4.2 by 3.3 m, in a private skeleton house, with rough, temporary, finishing, used furniture and stove.
2. Purchased kitchen furniture set, which I really want to collect
3. Ordered technique
4. Hands, some kind of tool and irrepressible desire all this is finally stored.
First, the kitchen was like this:
The furniture was strong, Soviet, and would have lived for a long time, but ... Mmm ... 21 centuries in the yard seems like.
Raid and bombing everything under zero. Linoleum from pieces.
Glamorous pink color, at one time, accidentally turned out due to Handi-Tarovka, asked for two years.
AAAA !!!! What does he do ??? 777 !!!! Yes, I will stick plasterboard and laying the wiring. And nothing terrible, it lies with the entire surface on the walls of the OSP, and the wire is not combustible, with a good margin in cross section.
Swamp box in a corner.
Under blocks of sockets are made here such boxes of screaming chipboard and laminate, screws on glue collected.
Putting the shots with wiring.
We begin to pervert with the ceiling. In one of my previous posts, I did with point lamps, (we look through the profile, who is not too lazy) And then I decided to throw a LED ribbon. That's later.
Krepim some glands, ugly so far.
The work is slow, the ceiling 2.7, jump at my 100 kg of live weight should be carefully (I'm not fat, I'm fluffy, if Cho).
But already something has been evaporated.
Get the ribbon. No RGB, just Baliy.
Glue a ribbon on the frame and plug.
Well, and of course test.
We sew the frame of plasterboard.
Splice, glue plinth. Eh, it would also quickly build as pictures to throw here ...
Ventcourt make up so. Then he will enter the top of the shelves under the hood.
Splice shoals on the walls.
Since there is no other slab while it is worth, lonely ...
We throw on the floor of Linoleum, and I have a panel on the wall.
In parallel, a separate cable 3x4 from the shield through the basement for the dishwasher and the electric copper is tightened.
Lepim wallpaper. I regretted a hundred times that I did not take fliseline, with a vinyl hemorrhoid an order of magnitude more.
Well, I got to the furniture. In the connecting places of technology and plumbing, we have some difficulties with drinking grooves under the pipes.
So that the joints of the pipes could be observed and repaired, if that, not hiding them at all, but we leave in the volume of the shelves.
A funny thing with awkles - siphon under the sink.
We put the tables, we throw the countertop (heavy, PPC) and the wall panel. Pre-in the wall panel drills holes for the socket.
Connect the oven and the cooking panel.
We smooth out the sockets, including HF. (two separate below)
We hang cabinets, screw the handles. These pictures are a little later made, after NG.
Something like this.
Well, the last. It seems that everything can be thrown than it fell.
The author is MadScientist.