Repaired the old "dvuhl"

Anonim

According to the author. We are a young family. We and your husband on 26, a child of a year and a half. Married in 2015, we began to live in a two-room apartment with the repair of the USSR. Old wallpaper, tile, creaking floors, window frames with holes in the finger, and most importantly - we got the lining, the sea of ​​lining (corridor, toilet and kitchen). She all darkened. It was a feeling that you are not in the apartment, but in the bath. Only brooms lacked. Thille thinking, we started doing repair, living in the apartment. There was not much time in the reserve: I was on the 5-6th week of pregnancy and before the birth of the child wanted to complete everything.

First of all, they decided to get rid of the hated wallboard. It was horror. Dust, dirt, garbage. But the most interesting was waiting for us ahead. Dranca was under the clapboard. She was attacked by the slightest silence. We realized that wallpaper could not glue on it. Remove the walls and lay the blocks - also not an option. We lived in the apartment and made the repairs in stages, as salaries arrive. Plus, the walls were very curves - the differences in height reached 17 cm. And we decided to sew the walls with plasterboard. Yes, we understood that we would lose a little in space, but at the exit we get smooth walls, not duch.

Repaired the old

Repaired the old

Lining, everywhere lining

Repaired the old

Kitchen to repair

The height from the floor to the ceiling we have 3.2 meters, plus the "stucco", with which it was not clear what to do. 3-meter plasterboard and profile parts - first the cuisine, then the corridor and in turn of the room. By the way, with storage and moving drywall, everything is not so simple. Try in the apartment to be with a sheet of 3000 by 1200 mm.

Repaired the old

Repaired the old

To perform work, the minimum necessary tool was purchased - a screwdriver, a normal level, a perforator. Plasterboard installation we started with a kitchen. The whole theory was drawn from the Internet. In their inexperience, we calculated and forgot to put the firming bar in the place where the kitchen will be attached, - I had to remove sheets and mount it.

Having reached the corridor, we realized that with the help of the usual level and threads with weights, we would not be able to create smooth walls on a large length. Bought a laser level. Plasterboard with him became much easier and faster. In general, it was not hard to work with this material. The profile was put up: I kept my husband fastened, the joints and corners were spitled. Slowly, but right, hopefully that soon it will end. Yes, "kosychili", twisted sometimes, swear ... I think the one who passed through the repair, understands us.

Repaired the old

Since we were waiting for the birth of a child, the main demand for the floor was the presence of a single height cloth throughout the apartment, with the exception of the bathroom and toilet. Initially, we planned to remove the old wooden floor, pour the screed, and use laminate as an outdoor coating. But at the first "in-depth" consideration of the situation, our plans collapsed - it turned out that we have wooden floors in the house between floors. After that, we decided to leave the old floor, slightly strengthening it (tried to remove the sylipses and severe irregularities). On top of the old floor, heat and noise insulation and OSB-slabs with a thickness of 15 mm were laid. Linoleum chose as an outdoor coating. Of particular difficulties, the laying of isolation and floor slabs did not cause.

But with Linoleum, I had to tinker a little. We decided to minimize the number of separate parts of the coating. Because of this, the markup and cutting of some parts accounted for on the street, since with a web size of 8 to 4 meters in our apartment, do not turn around.

Repaired the old

Since we have an old house, the question of wiring acutely. Began to learn from electricians how much it costs new. The price for us turned out to be the transcendental - in my opinion, $ 300 only for work, plus more wires, corrugations, shield and much more. My husband with engineering education. And YouTube to help him.

They estimate where the sockets, switches, and began to breed. The wires on the ceiling, putting it in pre-in corrugation, making junction boxes as necessary. All outlets and switches moved to a convenient height. Then they asked a friend, and he disconnected the old wiring for the "chocolateer" and connected a new one.

Fucking wallpaper began with a kitchen. After dark lining, we wanted light. Chose white wallpapers (under painting) and yellow kitchen with plastic facades. Since our house has no hot water, I really wanted to hide the gas column.

Repaired the old

The next ones were toilet and bathroom. We did not solve the repair on your own in these rooms. They began to look for performers, and then their help suggested a good acquaintance. We agreed. Replaced pipes on polypropylene, transferred the heated towel rail, made an extra plum in the installation site of the shower. Walls in the toilet sewed plasterboard.

A good friend decided to align the walls in the bathroom with a glass champion. Bought all the necessary materials, removed the apartment for a week and moved. At first glance, everything looked good. Calculated for the work and began to wash the fugu. With a detailed consideration, they saw on the tile of microcracks, which every day became more and more. Tile burst, despite the seams. Contact familiar. He first acknowledged his mistake and promised to fix everything, then he had no way to come on very important reasons, and then he made the verdict that we themselves are to blame, because we have wet in the bathroom.

Repaired the old

It turned out that the problem is in the glass chamber - it was fixed on glue point and not at the level, was also not projected. Under the weight of the tile, the glass chainsite sheets began to slide down.

In connection with the emergence in our family of replenishment, we did not have much time to expect and we decided to remake everything. Disassembled the shower cabin, removed all the tiles and glass turbines, found a performer with an official agreement and a guarantee. Probably, many will want to reproach us that the miser pays twice, but the cost of re-work on laying the tile and shuttering of the walls was even less than in the case of the first option.

The second site of work, where we did not cost without the help of professionals, began stretch ceilings.

Wallpaper in the corridor bought Belarusian, the parents were helped. By that time I was already well pregnant and removed from any work.

Rooms stood up in line. We went to the market "Zhdanovichi", bought eaves there. Before installing interroom doors I had to tinker with widths of openings, since the old doors were non-standard size. Our furniture is mostly Belarusian. Tables, True, from IKEA. Now slowly catching in.

So today our entrance hall and corridor looks:

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Kitchen:

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Room:

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Second room:

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Bathroom:

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Repaired the old

Now briefly about our expenses. By itself, the repair turnkey cost $ 6,200. This amount includes all building materials, tiles, wallpaper, linoleum, inlet and interior doors, heated towel rail, chandeliers and LED light bulbs, as well as tiler services and masters on the suspended ceilings and installation of doors.

Furniture cost more repairs - $ 7300. $ 2000 was given for the kitchen, as much as the embedded technique, refrigerator, sink and crane. Shower cabin - $ 1000. Two sofas, two tables and crib cost a total of $ 1050, another $ 900 - two wardrobe, $ 350 gave rise to a slide.

A source

Read more