I propose on my modest erection experience in this way: "Kitchens on the courier legs" attached to the summer house in the village. Will be
PS: For the dates in the photo Chur not to scold!
So let's go: we have such a house. We want extra. Premises for receiving guests, well, and santly themselves for convenience!
We ride not the necessary boards of Zavallenka from home and perform marking
Garden brown drills "holes" for the future foundation, sackets themselves chicken legs)))
The foundation will serve the tubes of Channels by 110, in the corners, stiletts for fastening the strapping
Pipes by sprinkling the sand, shed (yes, the concrete thickening is done below), reinforcing and concrete
Closed for a week to rub the ripening
Well, here is the bottom strapping: boards 150x50 in the corners attracted through studs to the pipes
The process goes - the boards leave
I will not go into the details of the installation of foam plastic in the strapping. In short. insulated
And covered with an osp - about such a football field turned out! Scale of the tragedy 3x8 meters!
On the so-called Seine or Bridge, in general, anyone, it was decided to cut the door.
But since all this household knows how it was stuck to the house it turned out like this)))
The trees are over, ordered sincere!
And so proceed, to the construction of the walls! Wall collected on the floor!
Then with the help of Archimedes and such a mother put them in place
The weight of the side wall was slightly surprised by my well, so when the lift almost got around
Ok, put. Fuh.
From impatience I decided to insert the windows
Installation of the ceiling ...
Rafters and roof. Closed while OSP and its rubur.
While the roof was done - the floor was poured a couple of times (((
A little aesthetics outside, so to speak to unite style. Daaaa - inserted plastic into the house, but this is another topic (if you wish about how I did repair in the house)
Inside insulated wool, tin, of course, especially the ceiling
Cheeper wata from the ceiling did not fall to me on the cap made with a thread on the stapler !!! Why, then in the urgent answer does not fall, they lie probably!
Steamizol ... everything is clear here
Ah yes, covered roof iron
It was decided to exist in this room the place for the new WS
In short, something like that - he will be there
Embedded to the trim inside. There will be plaster
For greater strength, Paul decided to send a chipboard, then probably Millennium!
Ceiling!!! Ceiling - from PVC! They are glossy panels, wide white
In the corner of the tub, an empty corner decided to use as a small locker
Ceiling, floor, walls
We work all, child labor encourage)
Waiting for the second part - just do not say that it will not be ....
Okay! Further, glass windows, painting, ceiling plinth
Suns on the input
Chandelier!!! Skolly 4 sticks, twisted holes for light bulbs and all this household on the chain to the ceiling! There will be a table
The spouse decided to start the design of this room in the style so to speak with a bias of Japan. Purchased paint brushes. Canvas - wall. Go
Blinds on the windows
Windows into the house covered with curtains
A source