For a new-fashioned hobby, fitness and bodybuilding requires special equipment that can be found in good gyms. Little provincial towns have such halls remain inaccessible, and therefore the locals themselves are looking for possible outputs from the current situation. One of these exits found residents of the village with a population of 12,000 people, at which the district administration drew their attention.
Two years, visitors to Sports School thought about making repairs in their small rocking. Money allocated officials who also offered them to make a list of all necessary and find suppliers. To travel, the inventory was highlighted by Gazelle, who, together with rolling enthusiasts, went for 1500 km to Moscow. Then the question was how to accommodate new equipment in the amount of 300,000 rubles into a small room in need of repairs in the amount of 200,000 rubles.
Next, you will find a photo solving problem with comments of one of the project inspirationors.
We decided to burn part of the foyer and combine two rooms, pass the repair in the foyer.
So far, we made all the old iron into the gym.
The oldest platform was removed, the conscience of 3 kg of nails per 1 square meter of wood from the board of Soviet nails.
From above, it was crushed by two-chamber rubber (visible on the first pictures), which is also not so easy to tear off.
Then the guys put the gypsum partition in the lobby
And parallel made the opening in the wall
Strengthened design
Put a gypsum wall
Now we start to engage in the corridor. They removed the old putty, which was very bad and smeared all the concrete contact.
Here came the concrete mixer. Passed her window and rushed
Switched switches. Then I had to remake, disassemble the floor of the wall, because according to the standards in children's institutions, the switches should be at a height of 180 cm.
And after everything began to occur in chaotic order. Soon the judo competitions were started, and it was necessary to have time to finish the corridor. Recruited my grandmother of my friend, who was previously repaired. With a partner in a couple of days they saw the entire corridor.
I can only be primed and painted.
In the meantime, the same super-women swam glass in the rocking rooms. And we inserted windows and painted the walls
Came of the second room
Mom volunteered to help paint. Herself now walks, swinging, the squad does, all in the case)
Soviet tires decided to lay on the floor, the roll of which was lying in the garage. As it turned out to be 1985.
Thickness 15 mm, reinforced, heavy, barely pulled out. Despite the frost, they cut them immediately into the size on the street, otherwise it is not to put in any way.
Than just not tried, it turned out to be faster than the stationery knife.
Beds and began to collect simulators
Simulators finally collected and you can take first healthy.
It remains only to hang mirrors
A source