After many years of torment and walnings for removable apartments finally bought a small apartment.
I decided to make a short post, telling about the stages of repair, maybe someone will come in handy.
Sick at the end,
Began with the construction of partitions, used 10 blocks (of course it would be better to use a brick, but finance forced to save
Further
yet
Partitions are ready
yet
Next, all the walls are plastecrim, we make geometry
yet
corridor
Future kitchen
yet
Bedroom Future
Hall
Begin to mount a rough electrician
There will be a shield
Powerboard on the floor (sockets and switches)
yet
At the same time, I mount the draft plumbing, did not particularly photograph
The main and only comb is not completely ready.
Next, fill the screed, the process did not photograph, so as not to interfere with the workers. Reinforced chatting, ceramzit and top mixture, total thickness 10 cm. It was possible to do thinner, but the floor radiators did not allow
1. Ceramizite under the screed is not bad, but !!!
On the perimeter of the screed, you did not make vibration insulation, hello to neighbors even on the side (you can only sympathize with the bottom). The movements of the chairs will be heard within a radius of 20 meters and for the neighbors will be "as if they move nearby."
2. Walls from foam blocks is a sound membrane! Those. All that is done in the neighbors will be transmitted to you with the effect of presence!
This is especially true of all sorts of washing machines at night, flaking by the doors, the bass of the subwoever 2 floors below, and even conversations will be heard ...
3. Since they made a suspended ceiling with a rather big budget, they could at least hang it on the vibrarodves, again with vibration insulation from the walls. Otherwise, this design slightly protects the neighbors from your acoustic noise, and you can almost crash from anything, and in some ranges only enhances the sounds.
balcony
More tie
Disassembled the facade on the balcony, won about 30 cm. Widths))
There are four layers of thermal insulation was, feeling in winter when -30 will be
Another disassembled balcony
While driving a screed start mounting a frame for plasterboard
More carcass
profile
Again profile
corridor
Already almost ready throughout the apartment
Some places leave the ceiling on the walls
In general, the profile all over the ceiling, but I will not lay out, because it's not very interesting and same
Next, we put the Minvatu Rockvul a thickness of 5 cm, for noise insulation. True, I understand that there will be no particular sense, because The noise is on concrete columns and overlaps.
Wool under the ceiling across the apartment, I will not lay out a lot of photos, the same type))
During the installation of the frame of the frame, the screed dried completely, about 3 weeks passed, the apartment was constantly warming up. Now you can start the installation of plasterboard.
Started
We sew in two layers so that there are no cracks
yet
Sew
yet
We proceed with painting draft work.
Close up of seams between GLK, we use a web, etc.
Detailed photos do not post
Apartment Beleet.
The space and volume of the apartment begins to feel
Chernovaya Parishka is ready, the walls are erased and began to paint. At the same time, the installation of the finishing electricity began, so that the malariers were better visible
The process of laying the tile missed, could not sweat, because there was a strong srach and nothing and so not visible
After the chisty painting works laminated laminate, put it quickly, in a couple of days, the photo did not do, only the result
almost done
On painting began to get off the shoals, I had to fix locally. Apparently poorly prepared some surfaces
Initially, they wanted to mount the plug on the wall and the ceiling, but then we decided to lay out the laminate, the same as on the floor
yet
The installation of doors began
Next, bold passes, corrected shoals, the installation of finishing plumbers began, assembling furniture, equipment, etc.
Some photos did on fish eye
made some cleaning and already started living
The resulting gym
Still Hall
Balcony, while empty, you need a chair
Here is such a bedroom turned out
yet
Kitchen
Koshak in place))
yet
We managed to make a small, but capacious dressing room. Literally 1.5 per 1.5 meters
I apologize for the Bardak
The bathroom is small, everyone installed in bulk.
Final!
With the number of focused, my first post
Everything went 4 and a half months
For money, everything cost about 3 million, planned to meet in 2. It included all draft and finishing works, draft and finishing materials, all furniture and kitchen appliances, clean electrician and plumbing, entrance door, etc. In general, absolutely all turnkey