House repair for grandson

Anonim

Last fall bought a house in the village cheaply, because Log in this house dared not everyone, but the foundation, walls and roof were strong, and we risked, especially since the finances did not have the finances.

That's what we purchased (terrible sight):

This is the main view from the street.

Entrance to the free house come in who wishes

Where was the kitchen with the stove

Next, everything with the same

There was no water, no gas, nor heating, and the snowball was already falling ... But we boldly shoved the sleeves and went to the "fight".

Pulled out and burned all the garbage along with the old partitions, broke the furnace, while simultaneously studying the laying of gas and water ... and the process went.

The material was delivered, put the beams and began to retain the floors.

We are not builders, but I had the idea, since our repairs also did themselves, and here and the daughter, and both grandson took up the case ...

And slowly began to retain the floors:

Floor flooring

Smoke rocker, so the snapshots are unimportants, but the memory is what!

The walls of the house are slag-free 70 cm thick, so the insulation was not required, they simply cleaned everything where the old plaster was.

And the gas liner began and installing the boiler and the gas column.

Thought water and dug a large drain pit:

Soon the heat boiler will begin and the heating is already ready

And here is a future kitchen with a cellar:

Grandfather with grandson all in the process of improvement

Next, took the partitions in the house:

Installation of partitions and plasterboard covering

Bedrooms and the hall began to be paid out:

Men endow the hall, and we are engaged in the daughter of painting ceilings and pasting

Chief Builder

And so, step by step, we approached almost to the final.

Work, of course, is still enough, but you can already live and slowly finish.

This is what happened:

New view from the street

Entrance to the house is no longer for everyone who is not too lazy

Popped photos this part of the hall

Gas boiler with a column for hot water

Bath with toilet (already convenience)

Opposite the bathroom

Hall or living room

Hall from another angle

Spallenka-1.

Bedroom -2.

Also bedroom2

And this is children

also children

Total area - 80 sq.m.

I think the young family will be enough.

Repair did in 3 months, now it will still be to refine the little things, the main thing is to want to really!

A source

Read more