Summer shower at the dacha from what was

Anonim

Summer shower at the dacha from what was

Gave a two year ago a water heater to the cottage. It was decided to store there (at the cottage) Summer shower. It was immediately stipulated that it would be made from the priest materials - those that already exist and purchases will be minimal.

While the wife with the mother-in-law chose a suitable place, I went to Sobetau for the Council and discussed possible options for assembling the soul. Piece of unsuitable for the assembly of the aluminum shelving (hereinafter referred to as the soul frame), the VG cable for electrical wiring, automatic on 25a, 5m reinforced hose, roofing screws, a pair of clamps, two steel plumbing fittings (in general, not badly squeezed) and the process The soul assembly began.

Unfortunately, I did not fall out the beginning of the process. Photographed on the shovel, so the quality is not very. In the meantime, I dug a pit, naturally do two things with one tool could not

I dug a hole about 1m depth and put into it an ordinary steel barrel for 200l. The barrel was already in holes - these are the consequences of burning wood-herbal unsuitable weather conditions

Summer shower at the dacha from what was

2. Heat the timber with a length of 120 cm, gathered the foundation of the future soul, leaving the gaps between the bars for ventilation. The foundation from the bar installed an aluminum frame from a former rack and brought all galvanized corners. Karkas turned out to be 120x120x220cm

Summer shower at the dacha from what was

Next, chopped four bands from the work remaining from the construction of the sickness. Bent them in length and laid on the foundation as catchment trays.

Summer shower at the dacha from what was

Still waterballs

Summer shower at the dacha from what was

A couple of years ago a cellular polycarbonate was bought and remained unused. Four triangles for collecting water were cut from it and installed on top of the catchment trays.

Summer shower at the dacha from what was

Fully assembled waterball

Summer shower at the dacha from what was

From above put the board 45 * 250mm, pre-processing the plane and a twigration along the length

Summer shower at the dacha from what was

Impertly holes in the board, because The board laid tightly with a gap of only about 1-2mm

Summer shower at the dacha from what was

Then "wrapped" the whole design into a cellular polycarbonate and put vertical rails from the faceplate from the front side (for fastening polycarbonate) and the rear (for fastening the water heater). The roof made an arched slide, supported by the central board and four corners with a radius under the roof, leaving the "windows" sides for ventilation.

Summer shower at the dacha from what was

Here you can see how the roof is made

Summer shower at the dacha from what was

Then I installed the water heater, secured the old plastic shelf borrowed from the bath, and the holder for the watering can.

Summer shower at the dacha from what was

Waterfloor secured on a rotating bar.

Summer shower at the dacha from what was

On the ends of polycarbonate put on a plastic end profile

Summer shower at the dacha from what was

Multied no holes - more diameter (do not watch perfectionists)

Summer shower at the dacha from what was

Cut off and drove galvanized corner at the entrance to the shower (no one hurt)

Summer shower at the dacha from what was

Bought for 100 rubles LED lamp and installed next to the watering area (the drinker is in the shower)

Summer shower at the dacha from what was

The test borrowed 60cm copper tube 5mm, for the curtains on the entrance. The house took the copper pipe ½ (21mm) with a length of 1M, which remained after repairing the bathroom. Passed the soul on the walls and hung the curtain bought for 250 rubles. So it was fenced with a hook zone and towels, as well as the entrance to the shower

Summer shower at the dacha from what was

The curtain fastened the hanger bought for 200r

Summer shower at the dacha from what was

Connected electrical wiring while hiding connections to the distribution unit

Summer shower at the dacha from what was

Shower is ready

Summer shower at the dacha from what was

4 days of vacation and 550r (hanger, curtain, lantern) were spent on all works.

Passed material and equipment (stocks available):

7M Cellular Polycarbonate

4m plastic end profile

2 three-meter bar 18x18

Collected aluminum frame size 120x120x210

4 corner of galvanized

Small piece of proflist

3 three-meter boards 45 * 250mm

2 two-meter boards 30 * 150mm

Box of roofing screws and pieces of 50 screws on a tree of different lengths.

Garden reinforced hose 5m

2 steel homuts

Crane, connecting barrel with ¾ on ½, tee ½ and two fittings.

JV 3x2.5 30m cable

Blue isolent

Automatic 25A

Terminals 3pcs

Distribution

Presented water heater 15l, 2.5 kW

That's all I wanted to say. Thank you! Criticism is welcome.

a source

Read more