We decided to get an apartment with my wife. The decision came spontaneously, so they chose not long. The house was still built, before the delivery remained 1 year. The apartment is small: kitchen -8.5 m; room 14.5 m; Corridor - 6 m big loggia 6 m.
Here in such a wonderful anthill
To disclose your creative potential, it was decided to repair the repair itself. And not only the repair itself, as well as a completely project, drawings and even furniture - all with their own hands. The wife doubtedly doubtedly and in every way called to abandon this venture - naive.
All legislation on preparing for repair began in the summer of 2015. I gradually began to master the 3DS MAX. The program is quite complicated in the development, but because According to the first formation, I am an engineer and had a lot of experience with 3D modeling at that time, then the development of Max was not worth a lot of strength. It all started certainly from the kitchen. Here are the first attempts to portray something.
Sample
Sample
Sample
The wife really thought that I would move and kill this idea, but I did not quit. Said - I will do the kitchen himself! Thus, time went, I was all better than Max
Rendering (pictures of the interior) were hundreds, so I won't let go. I'll post what came to your wife. Oddly enough, disagreements with his wife about the design did not arise. All I painted, she liked. Initially decided that the kitchen will be in Scandinavian style. Here are final kitchen pictures
kitchen
Kitchen
Well, in the image such a room was drawn
Room
Immediately make a reservation, the room is small, only 14.5 m therefore the bed will be replaced with the sofa over time, and the baby bed to another. In the corridor will also be made a dressing room.
Here are my hands to reach the bath. With the bathroom there were a lot of questions, the main of which is how to accommodate the washer there. With an existing layout, it did not normally fit.
Bathroom
Bathroom
All these options did not suit me, and I came to such a layout of the plan.
In Max, it was not strongly distinguished - the main general representation.
Bathroom
Price analysis was conducted in stores in St. Petersburg. Exodus was unambiguous - Lerua Merlin. Prices there are really cheaper than 10-20% than in other stores. Mostly everything was bought there. The tool was also purchased for 20 tr. I was pleased with the leaper perforator for 1600. I fought all the repair and at least henna. Now he really went up.
Well, here's the general concept ready, it remains to wait for keys from the apartment. And here he is a day x - inspection of the apartment. Feeling with my wife overwhelmed. With inspection, everything was arranged. All the recesses that were found did not embarrass me, it's all the same by alteration. That is the state of the apartment.
Kitchen
Kitchen
Bathroom
bathroom
room
corridor
corridor
Finishing from the series "Find the cheaper-difference to Return." Cheaper probably not to find. But a chic view from the window to the Neva.
Well, I rushed. The goal is how to make repairs and enter, because. Pay for removable desire little. April 27, 16 g I went to the apartment. Repairs began with the dirty bathroom. Before that I had no experience in repair. No. All I did here, I did for the first time. He began to turn off the wiring.
Hung a towel and collected box
System Check
Started laying tiles
Tile
Meanwhile, it was necessary to start television in the kitchen. Since the actual sizes were already, I began to drawings. Yes, and the project has changed a little.
Drawings were made, as well as the number of boxes
Kitchen
It's time to glue wallpaper. The mother-in-law was called to sit with small, and my wife and I fell on the May holidays fell on sticking. For me it was the hardest test. But we coped with him. Jocks of course grabs, but they will close everything. For the first time more than worthy. After I put a laminate in the whole apartment. It was easy.
Room
Final view of the room
Room
Kitchen
The corridor is not a picture. Meanwhile, found the office that will make the cut and ordered the kitchen. A week later she came ... ..
But it was still far from the kitchen. It was necessary to lay out apron and angle in the kitchen tiled.
Tile
tile
Tile
It's time for the designer
The kitchen was going simply. Collected, drilled, twisted
The main thing is to place correctly
Grows slowly
Doors then adjusted
kitchen
Bottom went
bottom
Already similar
Ikeev inexpensive stove
I also moved repair in the bathroom
I am a little volume with the worktop .. and ordered without the edge. I had to buy and glue the iron.
Ceiling
All major works were made in 2.5 months. Worked in non-stop mode. Everyone did one except the entrance doors and shook wallpapers. Here the move came. All finishes after moving.
Bathroom in the final version but still without furniture
Furniture will later do.
Room too with old furniture
Soon it will reach the wall of the hand
Kitchen with a temporary table and no oven
Kitchen
TV is possible to transfers
Corridor so far without a dressing room
Balcony
Balcony
At the moment, 220 tr (Tool inclusive) remains for everything about everything). It remains to make the wall, a dressing room. Buy sofa and furniture in the kitchen. I plan to meet at 100, a maximum of 150 tr. I think repairs turned out to be relatively budget, because I did everything myself. The kitchen with the technique cost about 60 tr. Since the money ran out, the rest will be done along the way. On the balcony I will make a bar rack along the window and put high chairs. And I will enjoy this kind. The wife is very pleased.
That's all I wanted to say!