House for her daughter

Anonim

I have (as in most) the father-in-law and a mother-in-law. They build a house, and every summer we have to participate in it. The daughters were bored there and we decided to equip her platform. The money resource was limited to us, within 30 tr. The house that we saw for us costs from 80. And then I realized that my right hand had risked between the shoulder and the fifth point.

House for her daughter

1. The site for the house was allocated between the house and the bath.

While it is a construction trash.

House for daughter.

2. In PAIA, coryato, drew only the framework. (Many will say a pervert, but damn autocadus and similar programs lazy to study)))) the rest kept in mind, his, wife and daughters))

In addition, at the time of construction, the wife ordered to lay the platform in the mirror reflection.

House for her daughter

3. The frame decided to concrete to the depth of half a meter.

He began with the drilling holes which then turned into ... .. Hemorrhoids. In general, in this place there is a highway to a bath, which friends from Solar Asia covered with construction trash.

Manual drilling turned into a manual droke and crushing blocks, bricks and rubble, extracting profile segments and boards, and so on ..

The main tool that is useful is scrap and palm.

House for daughter.

4. While I was a mole, my ladies covered the mastic timber for the frame. Straight coped. The youngest is the same, only in the subtle I had to send the plearmastic pants, a jacket, shoes and even a headdress (cap).

The bar immediately saw into the size on the market where it acquired.

House for daughter.

5. The depth of the holes of the foreman is pleased.

House for daughter.

6. Further, it was decided to collect two extreme parts of the frame.

House for her daughter

7. Put them, and collect the whole design further.

In addition to mastic, it was decided to wrap over the Bar Ruberoid.

House for daughter.

8. Fasteners of the frame look like this.

House for daughter.

9. The frame raised in this way: part 1 and 2 in the assembled form inserted into the holes, then connected them between themselves with the boards 3 and 4.

House for daughter.

10. Follow the other elements on it. Indicated corners were not planned. It was necessary to sculpt them along the play, for the design was a shaky.

House for daughter.

11. Frame is crooked. Therefore, it was necessary to run around with a level, level and tambourine. Lowing under the bearing bars of pebbles, jams and wet ...

The process was not sfotkal, because it was not before.

House for daughter.

12. Next Pictures of fasteners on the frame.

House for daughter.

13. Middle Karkasa

House for daughter.

14. The frame consists of a bar 10x10cm and a 10x5 boards.

House for daughter.

15. Corners who did not plan

House for daughter.

16. No concrete did not immediately. Floored rubble in the pit. Dummy.

House for daughter.

17. The bar and the board took the cheapest, then with the help of the EMM and the petal disk, grinding the frame. In the photo of the bar before and after and the necessary tool.

House for daughter.

18. Coloring frame and getting ready to make the floor.

House for daughter.

19. Boulybenim Paul and parallel with smear the cheapest impregnation.

House for daughter.

20. Here a little bit of me))

House for daughter.

21. Made a ladder. In the ground, it is also covered with mastic and cementing for 20. Well, the frame of the cement flooded, for it was already settled, horizontally and verticals are set aside.

House for daughter.

22. Lestenka.

House for daughter.

23. And then ... the soul in paradise rushed ... handrail on the stairs (1), railing (2), house (3), lags for the roof (4)

House for daughter.

24. From the bar 50x50 formed the window.

House for daughter.

25. The floor on the part is open for precipitation, made with the cracks, whatever the driver would be copied.

House for daughter.

26. Cheap rechargeable Shurik died quickly. Bought a shurka from the network.

House for daughter.

27. The walls of the house did from block house category C, cheapest. The uhm perfectly removes its shortcomings.

House for daughter.

28. It seems not bad.

House for daughter.

29. All the leopards grinding machine.

House for daughter.

30. Ladies engaged in painting, and I roof.

House for daughter.

31. I decided to cover the duline. I realized that I was an eccentric on the letter M))) half the square glued to PVA glue.

House for daughter.

32. Then it was handed that she had a sticky part)))

House for daughter.

33. Next cloud rushed. Clean and construction staples are attached.

House for daughter.

34. Wife in the process of painting.

Purchased and installed a swing (5.5 of the tyr).

House for daughter.

35. And now the result (I swam, I missed a lot). Finally painted, bought a slide for a slide (7 tyshs) in the perspective of a sandbox under a house and a clodder from the right end.

House for daughter.

)

A source